3/30/2021 0 Comments Aiag Ppap 4Th Edition
Part of the evaluation and analysis is the assessment of risk.The important point is that a discussion is conducted regarding the design (product or process), review of the functions and any changes in application, and the resulting risk of potential failure.Open-enrollment, instructor-led training will be held at AIAG training facilities, but you can also schedule onsite training at your organization.
A separate focused training course for the FMEA-MSR is under development. Failure Mode and Effects Analysis (FMEA) Overview 4th Edition. Benefit from learning about the common set of requirements that should be used to implement FMEA techniques into design and manufacturing processes. AIAG membership includes leading global manufacturers, parts suppliers, and service providers. Ive never heard of a customer asking for MSA reports for all control plan gagesmeasurement devices. For a better experience, please enable JavaScript in your browser before proceeding. Just the other day the Quality Manager contacted me to reject a PPAP because there was no capability study or RR. My response was there was no cpk or characteristics on teh print. The response was I need to do an RR on all gages used on the control plan and check a characteristic to make sure our process is cabable but no cpk was given. When looking in our PPAP foruth edition book it states to reference the MSA reference manual (we dont have it). My question is Is this a true statement and I need to RR all the gages and capability study this. Another question is there P.O stated a level 2 PPAP what does that really mean They also do not supply a bulk materials list on what they require. Todd. First, ISOTS 16949 says this about MSA: FONTArial,Bold FONTArial,Bold7.6.1 Measurement system analysisFONT FONT Statistical studies shall be conducted to analyse the variation present in the results of each type of measuring and test equipment system. This requirement shall apply to measurement systems referenced in the control plan. Aiag Ppap 4Th Edition Manuals On MeasurementThe analytical methods and acceptance criteria used shall conform to those in customer reference manuals on measurement systems analysis. Other analytical methods and acceptance criteria may be used if approved by the customer. The customer is asking you to comply with TS 16949 requirements, not specifically PPAP requirements. If your customer has never been specific about this in purchase orders (including by reference), you need to get the requirements clarified. The PPAP manual is now and always has been muddy on the issue. It says (on page 6 of the 4th edition): The organization shall have applicable Measurement System Analysis studies, e.g., gage RR, bias, linearity, stability, for all new or modified gages, measurement, and test equipment. See the Measurement Systems Analysis reference manual). Emphasis and punctuation errors in the original) What is generally expected is that a PPAP package will include capability and MSA reports for special characteristics. Some customers expect both even when there are no special characteristics. In those cases the dimension or characteristic to study is usually left to the supplier.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |